Implementasi Metode Overall Equipment Effectiveness Dan Six Big Losses Pada Cutting Machine

Authors

  • Irma Nurmala Dewi Universitas Bina Bangsa
  • Arta Rusidarma Putra Universitas Bina Bangsa
  • Hadi Kurniawanto Universitas Bina Bangsa
  • Ombi Romli Universitas Bina Bangsa
  • Dedy Khaerudin Universitas Bina Bangsa

DOI:

https://doi.org/10.61132/maeswara.v2i3.883

Keywords:

Overall Equipment Effectiveness, Six big losses, Fishbone

Abstract

Every company is obliged to carry out efficiency strategies in every business process in order to continue to exist in today's increasingly fierce competition. This research aims to determine the magnitude of the OEE value and the dominant factors from the six big losses analysis which is used as a proposal for improvements to the cutting machine at PT ABC. The method used is Availability Ratio, Performance Ratio and Rate of Product Quality as basic elements of Overall Equipment Effectiveness and Six Big Losses and analyzed using a fishbone diagram. Calculation results for the period September 2023 to February 2024 obtained an OEE value of 82.58% with the largest contributor to losses being the idling and minor stoppages and Reduce Speed ​​factors. To overcome this, it is necessary to increase skills in identifying and repairing machines, implementing clear standard operating procedures, operator skills in conveying information about machine damage, as well as standard material for parts used by machines.

 

 

References

Abadi Pinasthika. (2018). ANALISIS PERHITUNGAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) GUNA MENGURANGI SIX BIG LOSSES DAN UPAYA PERBAIKAN DENGAN PENDEKATAN KAIZEN 5S (Studi Kasus: PT. PINDAD (PERSERO)). Fakultas Teknologi Industri Universitas Islam Indonesia Yogyakarta, 10(1).

Agustin, M., Gusniar, I. N., & Setiawan, I. R. (2022). Analisis Efektifitas Kerja Mesin Calender Pada Salah Satu Proses Produksi Compressed Fiber Jointing Sheet di PT Arezda Purnama Loka Bogor Menggunakan Metode OEE (Overall Equipment Effectiveness). Jurnal Pendidikan Teknik Mesin Undiksha, 10(1).

Ahdiyat, T., & Nugroho, Y. A. (2022). ANALISIS KINERJA MESIN BANDSAW MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) dan SIX BIG LOSSES PADA PT QUARTINDO SEJATI FURNITAMA. Jurnal Cakrawala Ilmiah, 2(1). https://doi.org/10.53625/jcijurnalcakrawalailmiah.v2i1.3509

Anrinda, M., Edy Sianto, M., & Jaka Mulyana, I. (2021). Analisis Perhitungan Overall Equipment Effectiveness (Oee) Pada Mesin Offset Cd6 Di Industri Offset Printing. Jurnal Riset Dan Teknologi Terapan (RITEKTRA) .

Anthony, M. B. (2019). Analisis Penerapan Total Productive Maintenance (TPM) Menggunakan Overall Equipment Efectiveness (OEE) Dan Six Big Losses Pada Mesin Cold Leveller PT. KPS. JATI UNIK : Jurnal Ilmiah Teknik Dan Manajemen Industri, 2(2). https://doi.org/10.30737/jatiunik.v2i2.333

Budiartami, N. K., & Wijaya, I. W. K. (2019). Analisis Pengendalian Proses Produksi Untuk Meningkatkan Kualitas Produk Pada CV. Cok Konveksi di Denpasar. Jurnal Manajemen Dan Bisnis Equilibrium, 5(2). https://doi.org/10.47329/jurnal_mbe.v5i2.340

Ismail, N., & Setiafindari, W. (2023). USULAN PERBAIKAN KUALITAS PADA SARUNG TANGAN GOLF LOTUS MENGGUNAKAN METODE STATISTICAL QUALITY CONTROL DAN 5W+1H. Jurnal Ilmiah Teknik Mesin, Elektro Dan Komputer, 3(2). https://doi.org/10.51903/juritek.v3i2.1714

Lemadi, G., Khoiromi, M. S., & Prasetio, D. eko A. (2023). PERBAIKAN PREVENTIVE MAINTENANCE DENGAN MENGHILANGKAN SIX BIG LOSSES PADA MESIN TEST BENCH LINE POWERTRAIN SECTION DI PT SAPTAINDRA SEJATI. Jurnal Baut Dan Manufaktur: Jurnal Keilmuan Teknik Mesin Dan Teknik Industri, 5(2). https://doi.org/10.34005/bautdanmanufaktur.v5i2.3121

Maulida. (2020). TEKNIK PENGUMPULAN DATA DALAM METODOLOGI PENELITIAN. Darussalam, 21.

Nurmala Hamzah, T. T., & Momon, A. (2023). Analisis Total Productive Maintenance (TPM) Menggunakan Metode Overall Equipment Effectiveness (OEE) Pada Mesin Injection 2500T New di PT. XYZ. Jurnal Serambi Engineering, 8(1). https://doi.org/10.32672/jse.v8i1.4996

Qonita, N., Andesta, D., & Hidayat, H. (2022). Pengendalian Kualitas Menggunakan Metode Statistical Quality Control (SQC) pada Produk Kerupuk Ikan UD. Zahra Barokah. Jurnal Optimalisasi, 8(1). https://doi.org/10.35308/jopt.v8i1.5285

Rahman, M. F. M., Mahdie, M. F., & Thamrin, G. A. R. (2021). EFEKTIVITAS DAN EFISIENSI MESIN PRODUKSI WOOD CARPET DI PT SARIKAYA SEGA UTAMA KELURAHAN LANDASAN ULIN TENGAH BANJARBARU KALIMANTAN SELATAN. Jurnal Sylva Scienteae, 4(4). https://doi.org/10.20527/jss.v4i4.3946

Rifa’i, Y. (2023). Analisis Metodologi Penelitian Kulitatif dalam Pengumpulan Data di Penelitian Ilmiah pada Penyusunan Mini Riset. Cendekia Inovatif Dan Berbudaya, 1(1). https://doi.org/10.59996/cendib.v1i1.155

Rusidarma Putra, A., & Guritno, A. (2017). Penentuan Kondisi Lingkungan Kerja Fisik yang Optimal Menggunakan Metode Permukaan Respon. Jurnal Sistem Dan Manajemen Industri, 1(1). https://doi.org/10.30656/jsmi.v1i1.156

Sabaya, Z., Lasalewo, T., & Junus, S. (2023). EFEKTIVITAS ALAT ANGKUT FIXED CRANE MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. PELINDO (PERSERO) REGION IV GORONTALO. Jurnal Vokasi Sains Dan Teknologi, 2(2). https://doi.org/10.56190/jvst.v2i2.36

Saefulla, E., Putra, A. R., & Hartoko, G. (2022). Manajemen Sumber Daya Manusia. In Eureka Media Aksara: Vol. Pertama.

Setiabudi, M. E., Vitasari, P., & Priyasmanu, T. (2020). Jumlah Produk Cacat Dengan Metode Statistical Quality Control Pada Umkm . Waris Shoes. Jurnal Valtech, 3(2).

Siregar, D., Suwardiyanto, P., & Umar, D. (2020). Analisis Perhitungan OEE dan Menentukan Six Big Losses pada Mesin Spot Welding Tipe X. Journal of Industrial and Engineering System, 1(1). https://doi.org/10.31599/jies.v1i1.162

Vianty, K. D. O., Hutabarat, J., & A, S. T. S. L. (2022). Analisis Overall Equipment Effectiveness Untuk Meningkatkan Producktivitas Cup Filling Machine Melalui Pendekatan Six Big Losses. Jurnal Valtech (Jurnal Mahasiswa Teknik Industri), 5(1).

Wibowo, P. A., & Padilah, I. (2023). Analisis Overall Equipment Effectiveness (OEE) dan Six Big Losses Pada Mesin Length Adjusment Line 3 Departemen Belt Assy PT XYZ. G-Tech: Jurnal Teknologi Terapan, 7(2). https://doi.org/10.33379/gtech.v7i2.2236

Wuryanto, (2) Abdul Wahid. (2019). ANALISIS TOTAL PREDICTIVE MAINTENANCE DENGAN METODE OEE (OVERALL EQUIPMENT EFFECTIVENESS) GUNA MENINGKATKAN PERFORMA PADA MESIN HUSKY (PT. XY GEMPOL). Available Online at Http://Jurnal.Yudharta.Ac.Id/v2/Index.Php/Jkie, 1.

Published

2024-05-07

How to Cite

Irma Nurmala Dewi, Arta Rusidarma Putra, Hadi Kurniawanto, Ombi Romli, & Dedy Khaerudin. (2024). Implementasi Metode Overall Equipment Effectiveness Dan Six Big Losses Pada Cutting Machine. Maeswara : Jurnal Riset Ilmu Manajemen Dan Kewirausahaan, 2(3), 59–71. https://doi.org/10.61132/maeswara.v2i3.883

Similar Articles

1 2 > >> 

You may also start an advanced similarity search for this article.